Community facilities at ground and first floor, together with 7 general need flats, with their own entrance, stair and lift core, and 9 shared ownership flats, also with a separate entrance, stair and lift core. Designed to be low-energy with a superinsulated external envelope and a biomass boiler.
Services: | Client's Representative, CDM Co-ordinator, EcoHomes Assessor |
Contract Sum: |
~£4 million |
Contract: | PPC 2000 |
Client: | Metropolitan Housing Trust and Croydon Voluntary Action |
Architect: | Bill Dunster Architects |
Contractor: | Wates and LAD Construction |
Community centre with 15 no. flats for rent and shared ownership. Modern Method of Construction (MMC) used. Calcium silicate blockwork for high thermal mass, sound insulation and good environmental properties. Solar panels, pv panels and ground source heat pumps are being installed. Community centre includes a nature garden area and has all been developed with consultation with the local community.
Services: | Client's Representative, Quantity Surveyor, CDM Co-ordinator, EcoHomes Assessor |
Contract Sum: |
£2.7 million |
Contract: | PPC 2000 |
Client: | Metropolitan Housing Trust |
Architect: | HTA Architects |
Contractor: | LAD Construction |
Site clearance and excavation, and the construction of a single storey day centre for the elderly, in two phases.
Services: | Quantity Surveyor and Planning Supervisor |
Contract Sum: |
£500,000 |
Contract: | JCT Agreement for Minor Building Works 1998 Edition and JCT Intermediate Form of Building Contract 98 |
Client: | Agudas Israel Housing Association |
Architect: | Michael Katz Architects |
Contractor: | Beavercourt Ltd |